Query
CD4
Type
Entity Briefing
Entity
CD4
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on CD4

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

44 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
71.0%
Capacity factor
277 GWh
Annual generation
Briefing/plantOperating

CD4 is a 44 MW Geothermal asset in CAISO (California), currently Operating.

CD4 is reported in California since 2022 under CD4. Available operating and financial measures include 71.0% capacity factor and 277 GWh annual generation.

Location
Mono, California
Technology
Geothermal
Owner / parent
CD4
Operator
CD4
Grid
CAISO (California)
Plant ID
63490

What stands out

1

CD4 is a 44 MW Geothermal asset in California with status Operating.

2

Latest annual operating measures report 71.0% capacity factor and 277 GWh annual generation.

3

Latest linked story: “Ormat Technologies Announces Signing of ‘Blend-and-Extend’ Amendment for CD4 Geothermal Power Plant” (Energy Digital Magazine, 2026-03-16).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#21 of 32
National rank
#30 of 69

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.