Query
CCSU Fuel Cell Project
Type
Entity Briefing
Entity
CCSU Fuel Cell Project
Technology
fuel cell
Generated
2026-10-17T20:34:50.325Z

Briefing on CCSU Fuel Cell Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2012
Operating since
1
Generators
90.2%
Capacity factor
11 GWh
Annual generation
Briefing/plantOperating

CCSU Fuel Cell Project is a 1 MW Other Natural Gas asset in ISO New England, currently Operating.

CCSU Fuel Cell Project is reported in Connecticut since 2012 under New Britain Renewable Energy, LLC. Available operating and financial measures include 90.2% capacity factor and 11 GWh annual generation; $965/kW reported CapEx.

Location
Hartford, Connecticut
Technology
Other Natural Gas
Owner / parent
New Britain Renewable Energy, LLC
Operator
New Britain Renewable Energy, LLC
Grid
ISO New England
Plant ID
58237

What stands out

1

CCSU Fuel Cell Project is a 1 MW Other Natural Gas asset in Connecticut with status Operating.

2

Latest annual operating measures report 90.2% capacity factor and 11 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#45 of 47
National rank
#1845 of 2,025

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.