Query
CCCSD Wastewater Treatment Plnt
Type
Entity Briefing
Entity
CCCSD Wastewater Treatment Plnt
Generated
2026-10-17T18:28:56.167Z

Briefing on CCCSD Wastewater Treatment Plnt

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
1995
Operating since
1
Generators
71.3%
Capacity factor
20 GWh
Annual generation
Briefing/plantOperating

CCCSD Wastewater Treatment Plnt is a 4 MW Natural Gas Fired Combustion Turbine asset in CAISO (California), currently Operating.

CCCSD Wastewater Treatment Plnt is reported in California since 1995 under Central Contra Costa Sanitary District. Available operating and financial measures include 71.3% capacity factor and 20 GWh annual generation; $965/kW reported CapEx.

Location
Contra Costa, California
Technology
Natural Gas Fired Combustion Turbine
Owner / parent
Central Contra Costa Sanitary District
Operator
Central Contra Costa Sanitary District
Grid
CAISO (California)
Plant ID
57573

What stands out

1

CCCSD Wastewater Treatment Plnt is a 4 MW Natural Gas Fired Combustion Turbine asset in California with status Operating.

2

Latest annual operating measures report 71.3% capacity factor and 20 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#230 of 303
National rank
#1722 of 2,025

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.