Briefing on Cavell Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
502 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-07-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cavell Solar is a 502 MW Solar project in Texas, currently active.

IP Cavell, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-30.

Queue ID
ERCOT-29INR0034
Location
Castro, Texas
Technology
Solar
Developer
IP Cavell, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1

What stands out

1

Cavell Solar is a 502 MW Solar project in Texas with status active.

2

IP Cavell, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-30.

Market and operating context

Queue date
2024-07-22
Proposed COD
2029-07-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cavell Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0034
LocationCastro, Texas
TechnologySolar
DeveloperIP Cavell, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 23910 Windmill - 23912 Ogallala Ckt 1
Queue date2024-07-22
Proposed COD2029-07-30