Query
Causey
Type
Entity Briefing
Entity
Causey
Generated
2026-10-17T23:46:49.246Z

Briefing on Causey

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
1998
Operating since
3
Generators
27.2%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

Causey is a 2 MW Conventional Hydroelectric asset in Utah, currently Operating.

Causey is reported in Utah since 1998 under Weber Basin Water Conserv Dist. Available operating and financial measures include 27.2% capacity factor and 5 GWh annual generation; $2294/kW reported CapEx.

Location
Weber, Utah
Technology
Conventional Hydroelectric
Owner / parent
Weber Basin Water Conserv Dist
Operator
Weber Basin Water Conserv Dist
Grid
PacifiCorp - East
Plant ID
7548

What stands out

1

Causey is a 2 MW Conventional Hydroelectric asset in Utah with status Operating.

2

Latest annual operating measures report 27.2% capacity factor and 5 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#17 of 30
National rank
#1183 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.