Briefing/plantUnder construction
Castor is a 200 MW Batteries asset in ERCOT (Texas), currently Under construction.
Castor is reported in Texas under ENGIE. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Brazoria, Texas
- Technology
- Batteries
- Owner / parent
- ENGIE
- Operator
- Engie North America
- Grid
- ERCOT (Texas)
- Plant ID
- 65870
What stands out
1
Castor is a 200 MW Batteries asset in Texas with status Under construction.
2
Available financial measures include $1361/kW CapEx.
3
1 linked queue projects represent 205 MW of proposed capacity.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #75 of 344
- National rank
- #194 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.