Briefing on Castleton Energy Center

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
72 MW
Capacity
Operating
Current status
1992
Operating since
2
Generators
13.6%
Capacity factor
87 GWh
Annual generation
Briefing/plantOperating

Castleton Energy Center is a 72 MW Natural Gas Fired Combined Cycle asset in NYISO (New York), currently Operating.

Castleton Energy Center is reported in New York since 1992 under Fortistar Castleton Power. Available operating and financial measures include 13.6% capacity factor and 87 GWh annual generation; $965/kW reported CapEx.

Location
Rensselaer, New York
Technology
Natural Gas Fired Combined Cycle
Owner / parent
Fortistar Castleton Power
Operator
Fortistar Castleton Power
Grid
NYISO (New York)
Plant ID
10190

What stands out

1

Castleton Energy Center is a 72 MW Natural Gas Fired Combined Cycle asset in New York with status Operating.

2

Latest annual operating measures report 13.6% capacity factor and 87 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

4

Latest linked story: “Schodack, power plant settle tax tiff” (Times Union, 2010-12-23).

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#48 of 103
National rank
#1051 of 2,025

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.