Briefing on Cass County Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
PJM
Market / region
2023-12-31
Proposed COD
TC1
Queue phase
Briefing/projectactive

Cass County Solar is a 200 MW Solar+Battery project in Michigan, currently active.

Steelhead Solar, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-12-31.

Queue ID
PJM-AF2-396
Location
Cass, Michigan
Technology
Solar+Battery
Developer
Steelhead Solar, LLC
Market / region
PJM
Point of interconnection
Stinger 138 kV

What stands out

1

Cass County Solar is a 200 MW Solar+Battery project in Michigan with status active.

2

Steelhead Solar, LLC is the reported developer.

3

The reported queue phase is TC1; proposed COD is 2023-12-31.

Market and operating context

Queue date
2020-03-31
Proposed COD
2023-12-31
IA status
System Impact Study
Study phase
TC1
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cass County Solar — verified asset snapshot

FieldValue
Queue IDPJM-AF2-396
LocationCass, Michigan
TechnologySolar+Battery
DeveloperSteelhead Solar, LLC
Market / regionPJM
Point of interconnectionStinger 138 kV
Queue date2020-03-31
Proposed COD2023-12-31