Briefing/projectactive
Cass County Solar is a 200 MW Solar+Battery project in Michigan, currently active.
Steelhead Solar, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-12-31.
- Queue ID
- PJM-AF2-396
- Location
- Cass, Michigan
- Technology
- Solar+Battery
- Developer
- Steelhead Solar, LLC
- Market / region
- PJM
- Point of interconnection
- Stinger 138 kV
What stands out
1
Cass County Solar is a 200 MW Solar+Battery project in Michigan with status active.
2
Steelhead Solar, LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2023-12-31.
Market and operating context
- Queue date
- 2020-03-31
- Proposed COD
- 2023-12-31
- IA status
- System Impact Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.