Briefing/projectactive
Cascabel Wind 1 is a 198 MW Wind project in Texas, currently active.
Vaquero Wind Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-24INR0424
- Location
- Zapata, Texas
- Technology
- Wind
- Developer
- Vaquero Wind Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)
What stands out
1
Cascabel Wind 1 is a 198 MW Wind project in Texas with status active.
2
Vaquero Wind Energy, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2023-03-13
- Proposed COD
- 2027-12-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.