Cascabel Wind 1
Type
Entity Briefing
Entity
Cascabel Wind 1
Generated
2026-10-19T07:40:53.366Z

Briefing on Cascabel Wind 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
198 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Cascabel Wind 1 is a 198 MW Wind project in Texas, currently active.

Vaquero Wind Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-01.

Queue ID
ERCOT-24INR0424
Location
Zapata, Texas
Technology
Wind
Developer
Vaquero Wind Energy, LLC
Market / region
ERCOT
Point of interconnection
345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)

What stands out

1

Cascabel Wind 1 is a 198 MW Wind project in Texas with status active.

2

Vaquero Wind Energy, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-12-01.

Market and operating context

Queue date
2023-03-13
Proposed COD
2027-12-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cascabel Wind 1 — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0424
LocationZapata, Texas
TechnologyWind
DeveloperVaquero Wind Energy, LLC
Market / regionERCOT
Point of interconnection345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)
Queue date2023-03-13
Proposed COD2027-12-01