Query
Carris Storage I
Type
Entity Briefing
Entity
Carris Storage I
Generated
2026-10-18T14:07:54.705Z

Briefing on Carris Storage I

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
10 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Carris Storage I is a 10 MW Batteries asset in CAISO (California), currently Operating.

Carris Storage I is reported in California since 2025 under Hecate Grid Carris Storage 1 LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Riverside, California
Technology
Batteries
Owner / parent
Hecate Grid Carris Storage 1 LLC
Operator
Hecate Grid Carris Storage 1 LLC
Grid
CAISO (California)
Plant ID
65733

What stands out

1

Carris Storage I is a 10 MW Batteries asset in California with status Operating.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Fullmark Energy’s 20MW/40MWh California BESS reaches commercial operation” (Energy-Storage.News, 2025-08-25).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#134 of 202
National rank
#634 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Carris Storage I — verified asset snapshot

FieldValue
LocationRiverside, California
TechnologyBatteries
Owner / parentHecate Grid Carris Storage 1 LLC
OperatorHecate Grid Carris Storage 1 LLC
GridCAISO (California)
Plant ID65733
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator