Canyon Wind Project, LLC is a 309 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Canyon Wind Project, LLC is reported in Texas since 2024 under Canyon Wind Project, LLC. Available operating and financial measures include 40.5% capacity factor and 1094 GWh annual generation; $1468/kW reported CapEx.
- Location
- Scurry, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- Canyon Wind Project, LLC
- Operator
- Canyon Wind Project, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 60271
What stands out
Canyon Wind Project, LLC is a 309 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 40.5% capacity factor and 1094 GWh annual generation.
Available financial measures include $1468/kW CapEx.
1 linked queue projects represent 309 MW of proposed capacity.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #21 of 252
- National rank
- #74 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.