Briefing/projectactive
Cannibal Draw Solar is a 150 MW Solar+Battery project in Texas, currently active.
Cannibal Draw Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-04-10.
- Queue ID
- ERCOT-26INR0452
- Location
- Glasscock, Texas
- Technology
- Solar+Battery
- Developer
- Cannibal Draw Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Sand_Bluff 345 kV (59902)
What stands out
1
Cannibal Draw Solar is a 150 MW Solar+Battery project in Texas with status active.
2
Cannibal Draw Solar, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-04-10.
Market and operating context
- Queue date
- 2024-07-01
- Proposed COD
- 2028-04-10
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.