Query
Camino Solar Hybrid
Type
Entity Briefing
Entity
Camino Solar Hybrid
Technology
solar
Generated
2026-10-19T00:37:00.232Z

Briefing on Camino Solar Hybrid

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
44 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
36.1%
Capacity factor
105 GWh
Annual generation
Briefing/plantOperating

Camino Solar Hybrid is a 44 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Camino Solar Hybrid is reported in California since 2025 under Avangrid. Available operating and financial measures include 36.1% capacity factor and 105 GWh annual generation; $1544/kW reported CapEx.

Location
Kern, California
Technology
Solar Photovoltaic
Owner / parent
Avangrid
Operator
Avangrid Power LLC
Grid
CAISO (California)
Plant ID
63508

What stands out

1

Camino Solar Hybrid is a 44 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 36.1% capacity factor and 105 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

4

Latest linked story: “Avangrid switches on 57 MW Camino Solar in California | Projects Weekly” (Solar Builder, 2025-06-16).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#159 of 992
National rank
#1502 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.