Query
CAMINO SOLAR growth signals — PPAs, construction, new projects
Type
Entity Briefing
Entity
Camino Ranch Storage SLF
ISO/RTO
isone
Technology
solar
Generated
2026-10-12T13:52:26.188Z

Briefing on Camino Ranch Storage SLF

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
298 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-09
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Camino Ranch Storage SLF is a 298 MW Solar+Battery project in Texas, currently active.

Camino Solar Ranch, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-09.

Queue ID
ERCOT-24INR0420
Location
Houston, Texas
Technology
Solar+Battery
Developer
Camino Solar Ranch, LLC
Market / region
ERCOT
Point of interconnection
Tap to Jim English (#3351) – Flat Branch (#3345) 138kV

What stands out

1

Camino Ranch Storage SLF is a 298 MW Solar+Battery project in Texas with status active.

2

Camino Solar Ranch, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-09.

Market and operating context

Queue date
2022-10-18
Proposed COD
2028-12-09
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Camino Ranch Storage SLF — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0420
LocationHouston, Texas
TechnologySolar+Battery
DeveloperCamino Solar Ranch, LLC
Market / regionERCOT
Point of interconnectionTap to Jim English (#3351) – Flat Branch (#3345) 138kV
Queue date2022-10-18
Proposed COD2028-12-09