Query
CAMINO SOLAR
Type
Entity Briefing
Entity
CAMINO SOLAR
Generated
2026-10-12T02:30:37.363Z

Briefing on CAMINO SOLAR

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
58 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-12-31
Proposed COD
C10
Queue phase
Briefing/projectactive

CAMINO SOLAR is a 58 MW Solar+Battery project in California, currently active.

The reported queue phase is C10. Proposed COD is 2027-12-31.

Queue ID
CAISO-1419
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Whirlwind Substation 230kV

What stands out

1

CAMINO SOLAR is a 58 MW Solar+Battery project in California with status active.

2

The reported queue phase is C10; proposed COD is 2027-12-31.

3

Latest linked story: “Edwards & Sanborn Solar + storage Kern County, California” (Construction Review, 2025-08-07).

Market and operating context

Queue date
2017-05-01
Proposed COD
2027-12-31
IA status
IA Executed
Study phase
C10
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

CAMINO SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1419
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionWhirlwind Substation 230kV
Queue date2017-05-01
Proposed COD2027-12-31
IA statusIA Executed