Query
Calhoun County Solar Project
Type
Entity Briefing
Entity
Calhoun County Solar Project
Generated
2026-10-18T13:44:33.622Z

Briefing on Calhoun County Solar Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
125 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
23.7%
Capacity factor
217 GWh
Annual generation
Briefing/plantOperating

Calhoun County Solar Project is a 125 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Calhoun County Solar Project is reported in Michigan since 2025 under AES Clean Energy. Available operating and financial measures include 23.7% capacity factor and 217 GWh annual generation; $1606/kW reported CapEx.

Location
Calhoun, Michigan
Technology
Solar Photovoltaic
Owner / parent
AES Clean Energy
Operator
AES Clean Energy
Grid
MISO (Midcontinent)
Plant ID
64452

What stands out

1

Calhoun County Solar Project is a 125 MW Solar Photovoltaic asset in Michigan with status Operating.

2

Latest annual operating measures report 23.7% capacity factor and 217 GWh annual generation.

3

Available financial measures include $1606/kW CapEx.

4

Latest linked story: “Consumers Energy breaks ground on 360MW solar project in Michigan, US” (Energy Monitor, 2025-01-30).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#24 of 101
National rank
#696 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.