201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-11-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Caladium BESS is a 201 MW Battery project in Texas, currently active.

Caladium Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-11-30.

Queue ID
ERCOT-26INR0243
Location
Waller, Texas
Technology
Battery
Developer
Caladium Storage, LLC
Market / region
ERCOT
Point of interconnection
57664 Sunnyside 69kV

What stands out

1

Caladium BESS is a 201 MW Battery project in Texas with status active.

2

Caladium Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-11-30.

Market and operating context

Queue date
2024-11-19
Proposed COD
2027-11-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Caladium BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0243
LocationWaller, Texas
TechnologyBattery
DeveloperCaladium Storage, LLC
Market / regionERCOT
Point of interconnection57664 Sunnyside 69kV
Queue date2024-11-19
Proposed COD2027-11-30