Query
Caithness Long Island Energy Center
Type
Entity Briefing
Entity
Caithness Long Island Energy Center
State
RI
Generated
2026-10-17T13:17:16.303Z

Briefing on Caithness Long Island Energy Center

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
349 MW
Capacity
Operating
Current status
2009
Operating since
2
Generators
78.3%
Capacity factor
2388 GWh
Annual generation
Briefing/plantOperating

Caithness Long Island Energy Center is a 349 MW Natural Gas Fired Combined Cycle asset in NYISO (New York), currently Operating.

Caithness Long Island Energy Center is reported in New York since 2009 under ArcLight Capital Holdings. Available operating and financial measures include 78.3% capacity factor and 2388 GWh annual generation; $965/kW reported CapEx.

Location
Suffolk, New York
Technology
Natural Gas Fired Combined Cycle
Owner / parent
ArcLight Capital Holdings
Operator
Caithness Long Island, LLC
Grid
NYISO (New York)
Plant ID
56234

What stands out

1

Caithness Long Island Energy Center is a 349 MW Natural Gas Fired Combined Cycle asset in New York with status Operating.

2

Latest annual operating measures report 78.3% capacity factor and 2388 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

4

Latest linked story: “Caithness Energy to propose two battery energy storage plants at Yaphank site” (Newsday, 2025-03-13).

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#22 of 103
National rank
#617 of 2,025

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.