Query
Cairos Solar
Type
Entity Briefing
Entity
Cairos Solar
Generated
2026-10-19T21:42:03.674Z

Briefing on Cairos Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
153 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cairos Solar is a 153 MW Solar+Battery project in Texas, currently active.

Cairos Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-26INR0246
Location
Kinney, Texas
Technology
Solar+Battery
Developer
Cairos Solar, LLC
Market / region
ERCOT
Point of interconnection
ODLAW SWITCH (#7425)

What stands out

1

Cairos Solar is a 153 MW Solar+Battery project in Texas with status active.

2

Cairos Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

4

Latest linked story: “Hecate Energy seeks flood plain exemption for Copake solar project” (The Daily Gazette, 2026-03-09).

Market and operating context

Queue date
2023-10-04
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cairos Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0246
LocationKinney, Texas
TechnologySolar+Battery
DeveloperCairos Solar, LLC
Market / regionERCOT
Point of interconnectionODLAW SWITCH (#7425)
Queue date2023-10-04
Proposed COD2028-12-31