Briefing on Cado Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
206 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-04-06
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cado Storage is a 206 MW Battery project in Texas, currently active.

Cado Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-06.

Queue ID
ERCOT-25INR0346
Location
Bexar, Texas
Technology
Battery
Developer
Cado Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1

What stands out

1

Cado Storage is a 206 MW Battery project in Texas with status active.

2

Cado Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-06.

Market and operating context

Queue date
2023-03-13
Proposed COD
2029-04-06
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cado Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0346
LocationBexar, Texas
TechnologyBattery
DeveloperCado Storage, LLC
Market / regionERCOT
Point of interconnectionTap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1
Queue date2023-03-13
Proposed COD2029-04-06