Cadet Storage
Type
Entity Briefing
Entity
Cadet Storage
Generated
2026-10-20T01:14:07.863Z

Briefing on Cadet Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
104 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-07-28
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cadet Storage is a 104 MW Battery project in Texas, currently active.

TX BESS 5, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-28.

Queue ID
ERCOT-25INR0347
Location
Brazos, Texas
Technology
Battery
Developer
TX BESS 5, LLC
Market / region
ERCOT
Point of interconnection
Tap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY

What stands out

1

Cadet Storage is a 104 MW Battery project in Texas with status active.

2

TX BESS 5, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-28.

Market and operating context

Queue date
2023-05-22
Proposed COD
2029-07-28
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cadet Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0347
LocationBrazos, Texas
TechnologyBattery
DeveloperTX BESS 5, LLC
Market / regionERCOT
Point of interconnectionTap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY
Queue date2023-05-22
Proposed COD2029-07-28