Query
Cadence Energy Storage
Type
Entity Briefing
Entity
Cadence Energy Storage
Generated
2026-10-11T23:07:28.572Z

Briefing on Cadence Energy Storage

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
50 MW
Proposed capacity
suspended
Current status
Battery
Technology
PJM
Market / region
2026-03-20
Proposed COD
IA Executed
Queue phase
Briefing/projectsuspended

Cadence Energy Storage is a 50 MW Battery project in Ohio, currently suspended.

The reported queue phase is IA Executed. Proposed COD is 2026-03-20.

Queue ID
PJM-AD2-096
Location
Union, Ohio
Technology
Battery
Market / region
PJM
Point of interconnection
Marysville 345kV

What stands out

1

Cadence Energy Storage is a 50 MW Battery project in Ohio with status suspended.

2

The reported queue phase is IA Executed; proposed COD is 2026-03-20.

3

Latest linked story: “Invenergy breaks ground on 240MW Ohio solar PV plant” (PV Tech, 2025-06-13).

Market and operating context

Queue date
2018-03-21
Proposed COD
2026-03-20
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cadence Energy Storage — verified asset snapshot

FieldValue
Queue IDPJM-AD2-096
LocationUnion, Ohio
TechnologyBattery
Market / regionPJM
Point of interconnectionMarysville 345kV
Queue date2018-03-21
Proposed COD2026-03-20
IA statusIA Executed