Query
Cachi
Type
Entity Briefing
Entity
Cachi
Generated
2026-10-17T07:48:50.801Z

Briefing on Cachi

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
200 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Cachi is a 200 MW Batteries asset in ERCOT (Texas), currently Operating.

Cachi is reported in Texas since 2025 under ENGIE. Available operating and financial measures include $1361/kW reported CapEx.

Location
Guadalupe, Texas
Technology
Batteries
Owner / parent
ENGIE
Operator
Engie North America
Grid
ERCOT (Texas)
Plant ID
65861

What stands out

1

Cachi is a 200 MW Batteries asset in Texas with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#92 of 344
National rank
#178 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.