Query
Cabrillo College
Type
Entity Briefing
Entity
Cabrillo College
Generated
2026-10-17T12:41:37.688Z

Briefing on Cabrillo College

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
20.4%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Cabrillo College is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Cabrillo College is reported in California since 2023 under Forefront Power, LLC. Available operating and financial measures include 20.4% capacity factor and 4 GWh annual generation; $37.0/MWh reported energy value.

Location
Santa Cruz, California
Technology
Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
67179

What stands out

1

Cabrillo College is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.4% capacity factor and 4 GWh annual generation.

3

Available financial measures include $37.0/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#574 of 992
National rank
#5069 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.