Query
CA-Ventura County CCD-Ventura College
Type
Entity Briefing
Entity
CA-Ventura County CCD-Ventura College
Generated
2026-06-29T11:50:24.611Z

Briefing on CA-Ventura County CCD-Ventura College

Entity Briefing
Generated Jun 29, 2026·Data as of Jun 29
1
Generators
3 MW
Capacity
N/A
Capacity Factor
0
Queue Projects

CA-Ventura County CCD-Ventura College is a 3 MW solar plant in California, operated by Forefront Power, LLC, with a CapEx of $1544/kW and operational since 2025.

Overview

  • CA-Ventura County CCD-Ventura College is a 3 MW solar photovoltaic plant located in California.
  • The plant has been operating since 2025.
  • It is operated and owned by Forefront Power, LLC.

Fleet Details

  • The plant utilizes Solar Photovoltaic technology.
  • It consists of 1 generator.
  • The plant is connected to the CAISO (California) grid, under NERC: WECC, and its Balancing Authority is California Independent System Operator.

Financial Profile

  • The Capital Expenditure (CapEx) for the plant is $1544/kW, according to eia_agg_cost.

Contextual Landscape

  • Similar plants include OR - Green Key - Buckner CSG, AES Laubacher Solar CSG, and Flambeau Solar Partners.
  • Nearby plants are McGrath Peaker, Saticoy, and Oxnard.

The CA-Ventura County CCD-Ventura College plant represents a recent investment in solar photovoltaic technology within California, characterized by a competitive CapEx. Its operational status and grid integration highlight its contribution to the regional renewable energy landscape.

View full details