Query
CA-Ventura Co CCD-Oxnard College Canopy
Type
Entity Briefing
Entity
CA-Ventura Co CCD-Oxnard College Canopy
State
CO
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on CA-Ventura Co CCD-Oxnard College Canopy

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
20.6%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

CA-Ventura Co CCD-Oxnard College Canopy is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

CA-Ventura Co CCD-Oxnard College Canopy is reported in California since 2022 under Forefront Power, LLC. Available operating and financial measures include 20.6% capacity factor and 3 GWh annual generation; $12.8/MWh reported energy value.

Location
Ventura, California
Technology
Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
65447

What stands out

1

CA-Ventura Co CCD-Oxnard College Canopy is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.6% capacity factor and 3 GWh annual generation.

3

Available financial measures include $12.8/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#778 of 992
National rank
#6656 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.