Query
CA - Ventura Co CCD - Moorpark College
Type
Entity Briefing
Entity
CA - Ventura Co CCD - Moorpark College
State
CA
Generated
2026-10-12T11:56:58.019Z

Briefing on CA - Ventura Co CCD - Moorpark College

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
19.7%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

CA - Ventura Co CCD - Moorpark College is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

CA - Ventura Co CCD - Moorpark College is reported in California since 2023 under Forefront Power, LLC. Available operating and financial measures include 19.7% capacity factor and 5 GWh annual generation; $11.7/MWh reported energy value.

Location
Ventura, California
Technology
Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
65365

What stands out

1

CA - Ventura Co CCD - Moorpark College is a 3 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 19.7% capacity factor and 5 GWh annual generation.

3

Available financial measures include $11.7/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#543 of 992
National rank
#4872 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.