Briefing/plantUnder construction
CA Riverside 2356 Fleetwood Dr. is a 4 MW Batteries asset in CAISO (California), currently Under construction.
CA Riverside 2356 Fleetwood Dr. is reported in California under Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Riverside, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC
- Operator
- Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC
- Grid
- CAISO (California)
- Plant ID
- 66511
What stands out
1
CA Riverside 2356 Fleetwood Dr. is a 4 MW Batteries asset in California with status Under construction.
2
Available financial measures include $1544/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #165 of 202
- National rank
- #859 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.