CA - Fresno County - Juvenile Hall is a 3 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
CA - Fresno County - Juvenile Hall is reported in California since 2022 under Forefront Power, LLC. Available operating and financial measures include 2.2% capacity factor and 1 GWh annual generation; $7.1/MWh reported energy value.
- Location
- Fresno, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Forefront Power, LLC
- Operator
- Forefront Power, LLC
- Grid
- CAISO (California)
- Plant ID
- 65528
What stands out
CA - Fresno County - Juvenile Hall is a 3 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 2.2% capacity factor and 1 GWh annual generation.
Available financial measures include $7.1/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #534 of 992
- National rank
- #4816 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.