Query
CA - DGS RFP - RJ Donovan State Prison
Type
Entity Briefing
Entity
CA - DGS RFP - RJ Donovan State Prison
State
CA
Generated
2026-10-17T23:41:39.880Z

Briefing on CA - DGS RFP - RJ Donovan State Prison

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
29.2%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

CA - DGS RFP - RJ Donovan State Prison is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

CA - DGS RFP - RJ Donovan State Prison is reported in California since 2024 under Forefront Power, LLC. Available operating and financial measures include 29.2% capacity factor and 5 GWh annual generation; $1544/kW reported CapEx.

Location
San Bernardino, California
Technology
Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
65104

What stands out

1

CA - DGS RFP - RJ Donovan State Prison is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 29.2% capacity factor and 5 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#622 of 992
National rank
#5866 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.