Byllesby 2 is a 22 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Byllesby 2 is reported in Virginia since 1912 under American Electric Power Company. Available operating and financial measures include 10.0% capacity factor and 19 GWh annual generation; $1096/kW reported CapEx.
- Location
- Carroll, Virginia
- Technology
- Conventional Hydroelectric
- Owner / parent
- American Electric Power Company
- Operator
- Appalachian Power Co
- Grid
- PJM Interconnection
- Plant ID
- 3773
What stands out
Byllesby 2 is a 22 MW Conventional Hydroelectric asset in Virginia with status Operating.
Latest annual operating measures report 10.0% capacity factor and 19 GWh annual generation.
Available financial measures include $23.4/MWh OpEx, $1096/kW CapEx.
Latest linked story: “Appalachian Power’s effort to undermine rooftop solar meets stiff opposition” (Virginia Mercury, 2025-05-08).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #6 of 24
- National rank
- #468 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.