Briefing on Byllesby

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
4 MW
Capacity
Testing
Current status
2
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantTesting

Byllesby is a 4 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Testing.

Byllesby is reported in Minnesota under Dakota County, MN. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1415/kW reported CapEx.

Location
Dakota, Minnesota
Technology
Conventional Hydroelectric
Owner / parent
Dakota County, MN
Operator
Dakota County, MN
Grid
MISO (Midcontinent)
Plant ID
50328

What stands out

1

Byllesby is a 4 MW Conventional Hydroelectric asset in Minnesota with status Testing.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1415/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#14 of 23
National rank
#956 of 1,462

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.