Query
Buttonwood
Type
Entity Briefing
Entity
Buttonwood
Generated
2026-10-18T04:11:41.083Z

Briefing on Buttonwood

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
75 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
29.8%
Capacity factor
194 GWh
Annual generation
Briefing/plantOperating

Buttonwood is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Buttonwood is reported in Florida since 2024 under NextEra Energy. Available operating and financial measures include 29.8% capacity factor and 194 GWh annual generation; $1471/kW reported CapEx.

Location
St Lucie, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
65920

What stands out

1

Buttonwood is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 29.8% capacity factor and 194 GWh annual generation.

3

Available financial measures include $1471/kW CapEx.

4

Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#106 of 237
National rank
#1139 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.