Query
Butte College Main Campus Solar
Type
Entity Briefing
Entity
Butte College Main Campus Solar
State
ME
Technology
solar
Generated
2026-10-09T15:31:42.768Z

Briefing on Butte College Main Campus Solar

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
20.5%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Butte College Main Campus Solar is a 4 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Butte College Main Campus Solar is reported in California since 2011 under Butte-Glenn Community College District. Available operating and financial measures include 20.5% capacity factor and 6 GWh annual generation; $25.9/MWh reported energy value.

Location
Butte, California
Technology
Solar Photovoltaic
Owner / parent
Butte-Glenn Community College District
Operator
Butte-Glenn Community College District
Grid
CAISO (California)
Plant ID
57970

What stands out

1

Butte College Main Campus Solar is a 4 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.5% capacity factor and 6 GWh annual generation.

3

Available financial measures include $25.9/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#449 of 992
National rank
#4257 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.