Butler Solar Project 103 is a 104 MW Solar Photovoltaic asset in Georgia, currently Operating.
Butler Solar Project 103 is reported in Georgia since 2016 under Southern. Available operating and financial measures include 24.6% capacity factor and 224 GWh annual generation; $27.9/MWh reported energy value.
- Location
- Taylor, Georgia
- Technology
- Solar Photovoltaic
- Owner / parent
- Southern
- Operator
- Southern Power Co
- Grid
- Southern Company Services, Inc. - Trans
- Plant ID
- 59896
What stands out
Butler Solar Project 103 is a 104 MW Solar Photovoltaic asset in Georgia with status Operating.
Latest annual operating measures report 24.6% capacity factor and 224 GWh annual generation.
Available financial measures include $27.9/MWh energy value.
Latest linked story: “US DOE closes US$26.5 billion loan package to utility Southern Company for 16GW of capacity, including BESS” (Energy-Storage.News, 2026-03-09).
Market and operating context
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
- State rank
- #27 of 167
- National rank
- #781 of 7,971
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.