Butcherbird Solar
Type
Entity Briefing
Entity
Butcherbird Solar
Generated
2026-10-19T23:46:50.628Z

Briefing on Butcherbird Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
116 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-01-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Butcherbird Solar is a 116 MW Solar project in Texas, currently active.

Butcherbird Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-01-31.

Queue ID
ERCOT-25INR0337
Location
Bell, Texas
Technology
Solar
Developer
Butcherbird Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV - Bell County #133 to Bartlett Switch #114

What stands out

1

Butcherbird Solar is a 116 MW Solar project in Texas with status active.

2

Butcherbird Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-01-31.

Market and operating context

Queue date
2023-12-18
Proposed COD
2029-01-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Butcherbird Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0337
LocationBell, Texas
TechnologySolar
DeveloperButcherbird Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138 kV - Bell County #133 to Bartlett Switch #114
Queue date2023-12-18
Proposed COD2029-01-31