Briefing/projectactive
Butcherbird Solar is a 116 MW Solar project in Texas, currently active.
Butcherbird Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-01-31.
- Queue ID
- ERCOT-25INR0337
- Location
- Bell, Texas
- Technology
- Solar
- Developer
- Butcherbird Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV - Bell County #133 to Bartlett Switch #114
What stands out
1
Butcherbird Solar is a 116 MW Solar project in Texas with status active.
2
Butcherbird Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-01-31.
Market and operating context
- Queue date
- 2023-12-18
- Proposed COD
- 2029-01-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.