Query
Burro Loco Energy Storage
Type
Entity Briefing
Entity
Burro Loco Energy Storage
Generated
2026-10-19T11:27:13.457Z

Briefing on Burro Loco Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
25 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Burro Loco Energy Storage is a 25 MW Battery project in Texas, currently active.

VESI Upton County BESS, is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-15.

Queue ID
ERCOT-24INR0319
Location
Cameron, Texas
Technology
Battery
Developer
VESI Upton County BESS,
Market / region
ERCOT
Point of interconnection
8626 Resaca 69kV

What stands out

1

Burro Loco Energy Storage is a 25 MW Battery project in Texas with status active.

2

VESI Upton County BESS, is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-15.

Market and operating context

Queue date
2022-07-18
Proposed COD
2028-09-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Burro Loco Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0319
LocationCameron, Texas
TechnologyBattery
DeveloperVESI Upton County BESS,
Market / regionERCOT
Point of interconnection8626 Resaca 69kV
Queue date2022-07-18
Proposed COD2028-09-15