Briefing on Burgos Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
106 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-11-22
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Burgos Solar is a 106 MW Solar project in Texas, currently active.

Twin Oaks Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-11-22.

Queue ID
ERCOT-25INR0214
Location
Milam, Texas
Technology
Solar
Developer
Twin Oaks Solar, LLC
Market / region
ERCOT
Point of interconnection
3701 Rookie Switch 138 kV

What stands out

1

Burgos Solar is a 106 MW Solar project in Texas with status active.

2

Twin Oaks Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-11-22.

Market and operating context

Queue date
2022-10-18
Proposed COD
2027-11-22
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Burgos Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0214
LocationMilam, Texas
TechnologySolar
DeveloperTwin Oaks Solar, LLC
Market / regionERCOT
Point of interconnection3701 Rookie Switch 138 kV
Queue date2022-10-18
Proposed COD2027-11-22