Briefing/projectactive
Burgos Solar is a 106 MW Solar project in Texas, currently active.
Twin Oaks Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-11-22.
- Queue ID
- ERCOT-25INR0214
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Twin Oaks Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- 3701 Rookie Switch 138 kV
What stands out
1
Burgos Solar is a 106 MW Solar project in Texas with status active.
2
Twin Oaks Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-11-22.
Market and operating context
- Queue date
- 2022-10-18
- Proposed COD
- 2027-11-22
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.