Briefing/projectactive
BumbleBee Solar is a 212 MW Solar project in Texas, currently active.
BumbleBee Solar Farm LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-01.
- Queue ID
- ERCOT-26INR0412
- Location
- Bee, Texas
- Technology
- Solar
- Developer
- BumbleBee Solar Farm LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 5725 PawneeSW5 - 8689 Tango
What stands out
1
BumbleBee Solar is a 212 MW Solar project in Texas with status active.
2
BumbleBee Solar Farm LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-07-01.
Market and operating context
- Queue date
- 2024-02-27
- Proposed COD
- 2027-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.