Buffalo Meadow Solar
Type
Entity Briefing
Entity
Buffalo Meadow Solar
Generated
2026-10-19T16:31:28.613Z

Briefing on Buffalo Meadow Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
251 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Buffalo Meadow Solar is a 251 MW Solar+Battery project in Texas, currently active.

Buffalo Meadow Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-25INR0331
Location
Robertson, Texas
Technology
Solar+Battery
Developer
Buffalo Meadow Energy Center, LLC
Market / region
ERCOT
Point of interconnection
Tap Jack Creek (975) - Twin Oak (3400) 345kV line

What stands out

1

Buffalo Meadow Solar is a 251 MW Solar+Battery project in Texas with status active.

2

Buffalo Meadow Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

4

Latest linked story: “The largest remaining tall-grass prairie in Texas is getting solar panels. Environmentalists can’t stop it.” (The Washington Post, 2022-03-08).

Market and operating context

Queue date
2023-02-27
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Buffalo Meadow Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0331
LocationRobertson, Texas
TechnologySolar+Battery
DeveloperBuffalo Meadow Energy Center, LLC
Market / regionERCOT
Point of interconnectionTap Jack Creek (975) - Twin Oak (3400) 345kV line
Queue date2023-02-27
Proposed COD2028-09-30