Buffalo Meadow Solar is a 251 MW Solar+Battery project in Texas, currently active.
Buffalo Meadow Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.
- Queue ID
- ERCOT-25INR0331
- Location
- Robertson, Texas
- Technology
- Solar+Battery
- Developer
- Buffalo Meadow Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap Jack Creek (975) - Twin Oak (3400) 345kV line
What stands out
Buffalo Meadow Solar is a 251 MW Solar+Battery project in Texas with status active.
Buffalo Meadow Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-09-30.
Latest linked story: “The largest remaining tall-grass prairie in Texas is getting solar panels. Environmentalists can’t stop it.” (The Washington Post, 2022-03-08).
Market and operating context
- Queue date
- 2023-02-27
- Proposed COD
- 2028-09-30
- IA status
- Facility Study
- Study phase
- Facility Study