Query
Buffalo Gap 2 Wind Farm
Type
Entity Briefing
Entity
Buffalo Gap 2 Wind Farm
Technology
wind
Generated
2026-10-12T01:39:26.421Z

Briefing on Buffalo Gap 2 Wind Farm

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
233 MW
Capacity
Operating
Current status
2007
Operating since
1
Generators
17.2%
Capacity factor
350 GWh
Annual generation
Briefing/plantOperating

Buffalo Gap 2 Wind Farm is a 233 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Buffalo Gap 2 Wind Farm is reported in Texas since 2007 under AES Distributed Energy. Available operating and financial measures include 17.2% capacity factor and 350 GWh annual generation; $1895/kW reported CapEx.

Location
Nolan, Texas
Technology
Onshore Wind Turbine
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
ERCOT (Texas)
Plant ID
56484

What stands out

1

Buffalo Gap 2 Wind Farm is a 233 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 17.2% capacity factor and 350 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

1 linked queue projects represent 231 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#71 of 252
National rank
#211 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.