Briefing on Buckaroo BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
120 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-08
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Buckaroo BESS is a 120 MW Battery project in Texas, currently active.

Weatherford BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-08.

Queue ID
ERCOT-26INR0498
Location
Parker, Texas
Technology
Battery
Developer
Weatherford BESS LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV BROCK(487) – STHBROCKSW(489)

What stands out

1

Buckaroo BESS is a 120 MW Battery project in Texas with status active.

2

Weatherford BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-08.

Market and operating context

Queue date
2024-05-09
Proposed COD
2027-12-08
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Buckaroo BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0498
LocationParker, Texas
TechnologyBattery
DeveloperWeatherford BESS LLC
Market / regionERCOT
Point of interconnectionTap 138kV BROCK(487) – STHBROCKSW(489)
Queue date2024-05-09
Proposed COD2027-12-08