Buck Hydro is a 8 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Buck Hydro is reported in Virginia since 1912 under American Electric Power Company. Available operating and financial measures include 34.8% capacity factor and 26 GWh annual generation; $1436/kW reported CapEx.
- Location
- Carroll, Virginia
- Technology
- Conventional Hydroelectric
- Owner / parent
- American Electric Power Company
- Operator
- Appalachian Power Co
- Grid
- PJM Interconnection
- Plant ID
- 3772
What stands out
Buck Hydro is a 8 MW Conventional Hydroelectric asset in Virginia with status Operating.
Latest annual operating measures report 34.8% capacity factor and 26 GWh annual generation.
Available financial measures include $24.2/MWh OpEx, $1436/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #10 of 24
- National rank
- #713 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.