Briefing/projectactive
BRP Volans BESS is a 207 MW Battery project in Texas, currently active.
BRP Volans BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-23INR0071
- Location
- Winkler, Texas
- Technology
- Battery
- Developer
- BRP Volans BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 11189 Quarry Field SW - 1074 Wink 138kV
What stands out
1
BRP Volans BESS is a 207 MW Battery project in Texas with status active.
2
BRP Volans BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2020-08-04
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.