Briefing on BRP Snowdon BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
411 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Snowdon BESS is a 411 MW Battery project in Texas, currently active.

BRP SNOWDON BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.

Queue ID
ERCOT-23INR0330
Location
Briscoe, Texas
Technology
Battery
Developer
BRP SNOWDON BESS LLC
Market / region
ERCOT
Point of interconnection
23914 Tule Canyon Substation 345kV

What stands out

1

BRP Snowdon BESS is a 411 MW Battery project in Texas with status active.

2

BRP SNOWDON BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-01.

Market and operating context

Queue date
2021-09-15
Proposed COD
2028-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Snowdon BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0330
LocationBriscoe, Texas
TechnologyBattery
DeveloperBRP SNOWDON BESS LLC
Market / regionERCOT
Point of interconnection23914 Tule Canyon Substation 345kV
Queue date2021-09-15
Proposed COD2028-12-01