Briefing/projectactive
BRP Pollux BESS is a 163 MW Battery project in Texas, currently active.
BRP Pollux BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.
- Queue ID
- ERCOT-23INR0431
- Location
- Bosque, Texas
- Technology
- Battery
- Developer
- BRP Pollux BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 138 kV Olsen Switching Station (#37460)
What stands out
1
BRP Pollux BESS is a 163 MW Battery project in Texas with status active.
2
BRP Pollux BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-01.
Market and operating context
- Queue date
- 2022-01-06
- Proposed COD
- 2026-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.