Query
BRP Perseus BESS
Type
Entity Briefing
Entity
BRP Perseus BESS
State
TN
Technology
battery
Generated
2026-09-18T15:29:53.646Z

Briefing on BRP Perseus BESS

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
203 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Perseus BESS is a 203 MW Battery project in Texas, currently active.

BRP Perseus BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-22INR0390
Location
Nueces, Texas
Technology
Battery
Developer
BRP Perseus BESS LLC
Market / region
ERCOT
Point of interconnection
tap 138 kV line from Lon Hill (#8452) to Bessel (#8060)

What stands out

1

BRP Perseus BESS is a 203 MW Battery project in Texas with status active.

2

BRP Perseus BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

Market and operating context

Queue date
2020-08-21
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Perseus BESS — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0390
LocationNueces, Texas
TechnologyBattery
DeveloperBRP Perseus BESS LLC
Market / regionERCOT
Point of interconnectiontap 138 kV line from Lon Hill (#8452) to Bessel (#8060)
Queue date2020-08-21
Proposed COD2027-12-01