Briefing on BRP Passu BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Passu BESS is a 302 MW Battery project in Texas, currently active.

BRP Passu BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-23INR0139
Location
Wilbarger, Texas
Technology
Battery
Developer
BRP Passu BESS LLC
Market / region
ERCOT
Point of interconnection
6111 Riley 345kV

What stands out

1

BRP Passu BESS is a 302 MW Battery project in Texas with status active.

2

BRP Passu BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2020-12-03
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Passu BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0139
LocationWilbarger, Texas
TechnologyBattery
DeveloperBRP Passu BESS LLC
Market / regionERCOT
Point of interconnection6111 Riley 345kV
Queue date2020-12-03
Proposed COD2028-12-31