Briefing/projectactive
BRP Mekong BESS is a 410 MW Battery project in Texas, currently active.
BRP Mekong BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-24INR0135
- Location
- Robertson, Texas
- Technology
- Battery
- Developer
- BRP Mekong BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950)
What stands out
1
BRP Mekong BESS is a 410 MW Battery project in Texas with status active.
2
BRP Mekong BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2021-12-20
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.