Briefing on BRP Mekong BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
410 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Mekong BESS is a 410 MW Battery project in Texas, currently active.

BRP Mekong BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-24INR0135
Location
Robertson, Texas
Technology
Battery
Developer
BRP Mekong BESS LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950)

What stands out

1

BRP Mekong BESS is a 410 MW Battery project in Texas with status active.

2

BRP Mekong BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

Market and operating context

Queue date
2021-12-20
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Mekong BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0135
LocationRobertson, Texas
TechnologyBattery
DeveloperBRP Mekong BESS LLC
Market / regionERCOT
Point of interconnectionTap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950)
Queue date2021-12-20
Proposed COD2027-12-01