Query
BRP Kamet BESS
Type
Entity Briefing
Entity
BRP Kamet BESS
State
TN
Technology
battery
Generated
2026-10-05T06:43:18.457Z

Briefing on BRP Kamet BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2025-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Kamet BESS is a 202 MW Battery project in Texas, currently active.

BRP Kamet BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-01.

Queue ID
ERCOT-23INR0104
Location
Andrews, Texas
Technology
Battery
Developer
BRP Kamet BESS LLC
Market / region
ERCOT
Point of interconnection
Andrews North – McKenzie Draw Switch 138 kV

What stands out

1

BRP Kamet BESS is a 202 MW Battery project in Texas with status active.

2

BRP Kamet BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2025-12-01.

Market and operating context

Queue date
2020-10-07
Proposed COD
2025-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Kamet BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0104
LocationAndrews, Texas
TechnologyBattery
DeveloperBRP Kamet BESS LLC
Market / regionERCOT
Point of interconnectionAndrews North – McKenzie Draw Switch 138 kV
Queue date2020-10-07
Proposed COD2025-12-01