Briefing/projectactive
BRP Kamet BESS is a 202 MW Battery project in Texas, currently active.
BRP Kamet BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-01.
- Queue ID
- ERCOT-23INR0104
- Location
- Andrews, Texas
- Technology
- Battery
- Developer
- BRP Kamet BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- Andrews North – McKenzie Draw Switch 138 kV
What stands out
1
BRP Kamet BESS is a 202 MW Battery project in Texas with status active.
2
BRP Kamet BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2025-12-01.
Market and operating context
- Queue date
- 2020-10-07
- Proposed COD
- 2025-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.